What Does a Boeing 767-Based KC-46 Cost?

Photo of Paul Ausick
By Paul Ausick Updated Published
This post may contain links from our sponsors and affiliates, and Flywheel Publishing may receive compensation for actions taken through them.

Boeing KC-46A
The Boeing Co.
In 2011 the U.S. Air Force awarded a contract to Boeing Co. (NYSE: BA) for 179 new KC-46 refueling tankers to replace about a third of the Air Force’s current fleet KC-135 Stratotankers, which first entered service in 1957. Now Boeing will compete with Airbus and Israel Aerospace Industries to sell four new tankers to South Korea.

Boeing’s KC-46 is based on the company’s twin-engine, wide-body 767-200ER commercial passenger plane family — the 767-2C — which is a freighter version of the base aircraft similar to but not identical with the commercial freighter version, the 767-300F. The basic plane can be configured either as a tanker, an air medical evacuation plane or a cargo and passenger transport.

The 767-300F has a list price of $188 million. The passenger version, the 767-300ER, carries a list price of $188 million. The commercial planes use either two General Electric Co. (NYSE: GE) CF6-80C2 engines that develop 62,100 pounds of thrust or two Pratt & Whitney PW4000 engines that develop 63,300 pounds of thrust.

The KC-46 uses two Pratt & Whitney PW4062 engines, each of which develops 62,000 pounds of thrust. The plane can carry more than 212,000 pounds of fuel (about 31,200 gallons) and has a service ceiling of 43,100 feet and a maximum airspeed of around 650 miles per hour.

ALSO READ: Why a Boeing 777-300ER Costs $320 Million

The Government Accountability Office (GAO) issued a progress report in April on the KC-46 program and actually lowered the total cost from $51.7 billion to $51.4 billion. At that price, the U.S. Air Force is paying $287 million per plane, and that does not include a parts and maintenance contract. Adding in the value of the long-term parts and maintenance deal would about double the $51.4 billion value of the contract.

The contract with South Korea is worth about $1.38 billion, according to a report from Reuters. That works out to roughly $345 million per airplane. At that price, the contract almost certainly includes a parts and maintenance deal in addition to the planes.

The South Korean government is helping make up the difference that Boeing incurred for underbidding the contract. The company plans to eat about $200 million in development costs, which it plans to make up with higher volumes and parts sales.

Boeing expects to complete the first of four test aircraft in the third calendar quarter of 2014, and the first test flight is scheduled for the first quarter of 2015. The first delivery of a production plane to the Air Force is set for early 2016. All 179 planes are scheduled to be delivered by 2027.

ALSO READ: Why a Boeing 787-9 Costs $250 Million

Photo of Paul Ausick
About the Author Paul Ausick →

Paul Ausick has been writing for a673b.bigscoots-temp.com for more than a decade. He has written extensively on investing in the energy, defense, and technology sectors. In a previous life, he wrote technical documentation and managed a marketing communications group in Silicon Valley.

He has a bachelor's degree in English from the University of Chicago and now lives in Montana, where he fishes for trout in the summer and stays inside during the winter.

Featured Reads

Our top personal finance-related articles today. Your wallet will thank you later.

Continue Reading

Top Gaining Stocks

CBOE Vol: 1,568,143
PSKY Vol: 12,285,993
STX Vol: 7,378,346
ORCL Vol: 26,317,675
DDOG Vol: 6,247,779

Top Losing Stocks

LKQ
LKQ Vol: 4,367,433
CLX Vol: 13,260,523
SYK Vol: 4,519,455
MHK Vol: 1,859,865
AMGN Vol: 3,818,618